This was just a cool picture from a lightning storm up at the property.
HVAC stuff began getting installed.
Exposed beams for the grand room prepped and ready for installation.
Supports for above the beam are in place.
Center main beam is ready to go.
Front timbers done.
Back timbers done.
Blue roofing base is on most of the house at this point.
More HVAC vents installed.
Toilet mounts ready to go.
Cedar posts on the awnings.
Beautiful sunset.
More vents installed.
BEAMS ARE UP!!!
View from the entry way with the fireplace and beams in place.
Tongue and groove (T&G) installed in the front.
Other half of the porch T&G installed.
Electrical stuff getting done.
T&G done on half of the back porch.
Tubs arrived for the upstairs bathrooms.
Plumbing for the tubs is done.
Back porch with T&G.
View from the front door with the T&G done.
View of the front porch with the T&G.
Vents from the bathrooms up to the roof.
Upstairs plumbing coming along.
Vents from the plumbing up to the roof.
Vent above the stove hood in place and ready to go.
T&G in the back ready to go.
All roofing paper is in place and vents are poking out.
Tomorrow we have a meeting to go over cabinets with the cabinet maker and then next week we do the electrical walk through. Progress!