Plumbing rough in done...Electrical!

I got my hot/cold hose bib in the garage. Other hose bibs around the house. Laundry room vents and plumbing roughed in. Electrical started. We met with our cabinet guy last week and our electrician earlier this week. Once the cabinetry was finalized the electrician put the cabinet plans everywhere so they know what to plan for. We did a 2 and a half hour walk through with our electrician this week and the next day he got to work. We planned switches and plugs and talked light placement and all that fun stuff. Here's to hoping we don't regret our decisions and wish we had put a plug somewhere or gotten rid of a light switch in one of the halls or something like that.  Double stackable laundry cabinets.  Electrical work getting done. Also, the fireplace kit was delivered. Should be getting installed this week! We meet with our flooring people again this coming week to finalize our flooring options. Exciting stuff.  

Wrapping up the framing - Plumbing and HVAC

  Garage is open and now that the framing is done they uncovered the windows. The final awnings were being built. Final set of awnings are now over the garage. Blue roofing material went on parts of the roof this week. I imagine it should be done by the end of next week.  We showed up and found a bunch of mechanical heating/cooling equipment in the garage early in the week. We changed the stain color for our beams to Dark Oak with the tongue and groove being stained at 50% of the same color so we have some contrast. More of the roof. Most recent photo of the front of the house. Back porch is done. See the pictures below for the process. Picture from the inside with the upper wall still open. Picture from the upstairs bedroom looking into the backyard and onto the new pack patio/porch. Chimney was added! Heating/cooling and plumbing coming along nicely below the house. In the crawl space it is clear that they've been working but not much to show in the actual house as of yet. T...

Windows! Almost done framing, plumbing...

They framed out the base of our porch columns. The beams for the living room arrived. Still working on the last bedroom and music room over the garage. Fireplace and hearth built in. A few days later it rained like crazy and there was about a half of an inch of water on the floor in some parts of the house. I went over with a push broom and pushed it all out into the garage. It took me about an hour and a half. It is typically dry here so after I got the water out it was windy but no more rain came and it dried completely out by the next morning.  The trusses above were prepped for the beams that will go in the living room.  They lowered the header going into the front room. Guest bath shower pony wall and lowered ceiling so the glass doesn't have to be so tall. Little awning over the upstairs bedroom. Windows arrived along with the temporary front doors. Also this is a view from across the garage. The next few pictures are of the garage now that they've taken all the supports...