Windows! Almost done framing, plumbing...


They framed out the base of our porch columns.



The beams for the living room arrived.


Still working on the last bedroom and music room over the garage.



Fireplace and hearth built in.


A few days later it rained like crazy and there was about a half of an inch of water on the floor in some parts of the house. I went over with a push broom and pushed it all out into the garage. It took me about an hour and a half. It is typically dry here so after I got the water out it was windy but no more rain came and it dried completely out by the next morning. 


The trusses above were prepped for the beams that will go in the living room. 


They lowered the header going into the front room.


Guest bath shower pony wall and lowered ceiling so the glass doesn't have to be so tall.


Little awning over the upstairs bedroom.


Windows arrived along with the temporary front doors. Also this is a view from across the garage. The next few pictures are of the garage now that they've taken all the supports out from inside the garage.


Looking from the window (east) toward the side door (west).


Standing by the side door looking toward the windows.


Finished the upstairs bedroom.


Windows in everywhere but the music room which still had to be framed. 


Back of the house. With the windows.


Back corner by the master and the garage.


Front with some early roofing material. 



Bedroom above the garage with the awning.


I got into the crawl space to see what the plumbers were up to. 



Here is where we had to add a false wall for plumbing, making our living room about 3.5 inches shorter than we had planned. I think we'll servive.


A few days later they had something going on.


It cleaned up nice.


Water running to the laundry room.


The back porch beams are coming together.



The back with some more roofing stuff over the garage and the porch beams.


Music room all done...Finally.


This was the last picture we took before leaving the property today. 

Tomorrow we have a big meeting at the flooring store to go over our finishes and presumably pick out flooring. We looked at some stains and will be finalizing that. We are picking a stain for the timbers as well as for the tongue and groove ceiling above the porch and the back patio. More info to come.


Popular posts from this blog

Wrapping up the framing - Plumbing and HVAC

  Garage is open and now that the framing is done they uncovered the windows. The final awnings were being built. Final set of awnings are now over the garage. Blue roofing material went on parts of the roof this week. I imagine it should be done by the end of next week.  We showed up and found a bunch of mechanical heating/cooling equipment in the garage early in the week. We changed the stain color for our beams to Dark Oak with the tongue and groove being stained at 50% of the same color so we have some contrast. More of the roof. Most recent photo of the front of the house. Back porch is done. See the pictures below for the process. Picture from the inside with the upper wall still open. Picture from the upstairs bedroom looking into the backyard and onto the new pack patio/porch. Chimney was added! Heating/cooling and plumbing coming along nicely below the house. In the crawl space it is clear that they've been working but not much to show in the actual house as of yet. T...

Here we go again!

Trusses arrived today! This was the first of two loads! That's a lot of trusses. This week, in preparation for the trusses the crew came out for a few days to get some of the upstairs done that didn't need the truesses. This is looking from the great room into the kitchen and above the kitchen and front room we have some bedrooms.  They started the staircase and I noticed that under the landing there was A TON of wasted space. See above and below.  I asked our builder about in and she said she'd talk with the crew.  The steel beam arrived for the garage. It is very big. The crew finished the stairs and opened it up BIG TIME! I was super happy about this. It increased the storage in our house dramatically. I'm six feet tall and can walk into the farthest back part of this closet standing straight up. IT IS AWESOME!!! More closet. Where the ladders are stored is about 6 feet tall! Landing on the staircase. Down this hall will be another bedroom and a loft and my music roo...

Foundation Prep

The soil on our lot was not great for a foundation so we had to dig a deep hole and then back fill it with soil that can compact well enough to support the house. We had to put 3 feet of backfill in! We watched them bring load after load of dirt and then smooth it out and compact it and then do it all over again until the full 3 feet were filled in. Last night I took my daughter up there after soccer practice and we walked around on the final grade. Footings and forms should be going up next week!