Windows! Almost done framing, plumbing...


They framed out the base of our porch columns.



The beams for the living room arrived.


Still working on the last bedroom and music room over the garage.



Fireplace and hearth built in.


A few days later it rained like crazy and there was about a half of an inch of water on the floor in some parts of the house. I went over with a push broom and pushed it all out into the garage. It took me about an hour and a half. It is typically dry here so after I got the water out it was windy but no more rain came and it dried completely out by the next morning. 


The trusses above were prepped for the beams that will go in the living room. 


They lowered the header going into the front room.


Guest bath shower pony wall and lowered ceiling so the glass doesn't have to be so tall.


Little awning over the upstairs bedroom.


Windows arrived along with the temporary front doors. Also this is a view from across the garage. The next few pictures are of the garage now that they've taken all the supports out from inside the garage.


Looking from the window (east) toward the side door (west).


Standing by the side door looking toward the windows.


Finished the upstairs bedroom.


Windows in everywhere but the music room which still had to be framed. 


Back of the house. With the windows.


Back corner by the master and the garage.


Front with some early roofing material. 



Bedroom above the garage with the awning.


I got into the crawl space to see what the plumbers were up to. 



Here is where we had to add a false wall for plumbing, making our living room about 3.5 inches shorter than we had planned. I think we'll servive.


A few days later they had something going on.


It cleaned up nice.


Water running to the laundry room.


The back porch beams are coming together.



The back with some more roofing stuff over the garage and the porch beams.


Music room all done...Finally.


This was the last picture we took before leaving the property today. 

Tomorrow we have a big meeting at the flooring store to go over our finishes and presumably pick out flooring. We looked at some stains and will be finalizing that. We are picking a stain for the timbers as well as for the tongue and groove ceiling above the porch and the back patio. More info to come.


Popular posts from this blog

Wrapping up the framing - Plumbing and HVAC

  Garage is open and now that the framing is done they uncovered the windows. The final awnings were being built. Final set of awnings are now over the garage. Blue roofing material went on parts of the roof this week. I imagine it should be done by the end of next week.  We showed up and found a bunch of mechanical heating/cooling equipment in the garage early in the week. We changed the stain color for our beams to Dark Oak with the tongue and groove being stained at 50% of the same color so we have some contrast. More of the roof. Most recent photo of the front of the house. Back porch is done. See the pictures below for the process. Picture from the inside with the upper wall still open. Picture from the upstairs bedroom looking into the backyard and onto the new pack patio/porch. Chimney was added! Heating/cooling and plumbing coming along nicely below the house. In the crawl space it is clear that they've been working but not much to show in the actual house as of yet. T...

Finished framing! Plumbing, HVAC and electrical...

This was just a cool picture from a lightning storm up at the property.  HVAC stuff began getting installed. Exposed beams for the grand room prepped and ready for installation. Supports for above the beam are in place. Center main beam is ready to go. Front timbers done. Back timbers done. Blue roofing base is on most of the house at this point. More HVAC vents installed. Toilet mounts ready to go. Cedar posts on the awnings. Beautiful sunset. More vents installed. BEAMS ARE UP!!! View from the entry way with the fireplace and beams in place. Tongue and groove (T&G) installed in the front. Other half of the porch T&G installed. Electrical stuff getting done. T&G done on half of the back porch. Tubs arrived for the upstairs bathrooms. Plumbing for the tubs is done.  Back porch with T&G. View from the front door with the T&G done. View of the front porch with the T&G. Vents from the bathrooms up to the roof.  Upstairs plumbing coming along.  Ve...

Foundations

 One of the things I really want is a big, open garage. We planned it all out in the drawings but recently we heard back from the structural engineer that they will have to put a post/column in the middle of the garage. We talked with our builder about what could be done. She asked about a bigger truss but the truss guy says that they can't build a bigger truss.  We decided to pay the engineer to do the math and see if a large steel beam could be used because according to our builder she doesn't expect the beam to add that much cost, if its possible.  The engineer is currently working on seeing if its possible. If it is possible they will likely have to make the footings bigger and that would add concrete cost but overall the cost can't be predicted until the engineer updates his plans. Once the plans are updated our builder can let us know about costs and at that point we can decide if the increase cost is worth it or not.  I feel that paying an engineer a little mo...