Skip to main content

Windows! Almost done framing, plumbing...


They framed out the base of our porch columns.



The beams for the living room arrived.


Still working on the last bedroom and music room over the garage.



Fireplace and hearth built in.


A few days later it rained like crazy and there was about a half of an inch of water on the floor in some parts of the house. I went over with a push broom and pushed it all out into the garage. It took me about an hour and a half. It is typically dry here so after I got the water out it was windy but no more rain came and it dried completely out by the next morning. 


The trusses above were prepped for the beams that will go in the living room. 


They lowered the header going into the front room.


Guest bath shower pony wall and lowered ceiling so the glass doesn't have to be so tall.


Little awning over the upstairs bedroom.


Windows arrived along with the temporary front doors. Also this is a view from across the garage. The next few pictures are of the garage now that they've taken all the supports out from inside the garage.


Looking from the window (east) toward the side door (west).


Standing by the side door looking toward the windows.


Finished the upstairs bedroom.


Windows in everywhere but the music room which still had to be framed. 


Back of the house. With the windows.


Back corner by the master and the garage.


Front with some early roofing material. 



Bedroom above the garage with the awning.


I got into the crawl space to see what the plumbers were up to. 



Here is where we had to add a false wall for plumbing, making our living room about 3.5 inches shorter than we had planned. I think we'll servive.


A few days later they had something going on.


It cleaned up nice.


Water running to the laundry room.


The back porch beams are coming together.



The back with some more roofing stuff over the garage and the porch beams.


Music room all done...Finally.


This was the last picture we took before leaving the property today. 

Tomorrow we have a big meeting at the flooring store to go over our finishes and presumably pick out flooring. We looked at some stains and will be finalizing that. We are picking a stain for the timbers as well as for the tongue and groove ceiling above the porch and the back patio. More info to come.


Popular posts from this blog

Foundations

 One of the things I really want is a big, open garage. We planned it all out in the drawings but recently we heard back from the structural engineer that they will have to put a post/column in the middle of the garage. We talked with our builder about what could be done. She asked about a bigger truss but the truss guy says that they can't build a bigger truss.  We decided to pay the engineer to do the math and see if a large steel beam could be used because according to our builder she doesn't expect the beam to add that much cost, if its possible.  The engineer is currently working on seeing if its possible. If it is possible they will likely have to make the footings bigger and that would add concrete cost but overall the cost can't be predicted until the engineer updates his plans. Once the plans are updated our builder can let us know about costs and at that point we can decide if the increase cost is worth it or not.  I feel that paying an engineer a little mo...

Cranes and Trusses

  The crane was scheduled for Tuesday so on Monday they got things ready.  Early Tuesday morning they were cranking. Here's the crane from far away. The crane in action.  View of the back dinning room. Great room with trusses. Great room as seen from the entry way.  The upstairs bedrooms were done with this little perch of what became a hallway. This is the "before" so you can appreciate the after. They put the trusses on the upstairs bedrooms over the entryway and you can see that below.  Trusses over the main living area and some of the trusses over the garage where there is some more living space. The crane was rented for 5 hours on Tuesday and this is what they got done. They will get the crane again this week and they are hoping to be done with the trusses at that point.  They put up the front, east facing, wall of the hallway. Same thing from inside the garage. Back, west facing, wall of the hallway was done. Starting to push out over the garage. This...

Ugggghhhhh...

This was a text exchange with our builder from 2 weeks ago...COVID is essentially over but we're still dealing with the effects... A week after the text above this was done. They really only put the joists above the kitchen, dinning room and the formal living room area and finished the plywood walls.  Above is a picture from the entrance hall looking through the main living area (where we will have vaulted ceilings) and into the dinning room/kitchen area.  Kitchen looking into the dinning room.  Stairs will go here. Front of the garage. You can see the stairwell poking up behind the garage. Full frontal... Looking from the dinning area down the hall to the master. Wood burning fireplace will go between those windows.  Looking at the main living area from the kitchen. Looking from the house out into the garage. Same as above just panned right. Exterior garage. In all likelihood nothing will really change until the week of June 14th-18th and from there I bet it'll be a...