Windows! Almost done framing, plumbing...


They framed out the base of our porch columns.



The beams for the living room arrived.


Still working on the last bedroom and music room over the garage.



Fireplace and hearth built in.


A few days later it rained like crazy and there was about a half of an inch of water on the floor in some parts of the house. I went over with a push broom and pushed it all out into the garage. It took me about an hour and a half. It is typically dry here so after I got the water out it was windy but no more rain came and it dried completely out by the next morning. 


The trusses above were prepped for the beams that will go in the living room. 


They lowered the header going into the front room.


Guest bath shower pony wall and lowered ceiling so the glass doesn't have to be so tall.


Little awning over the upstairs bedroom.


Windows arrived along with the temporary front doors. Also this is a view from across the garage. The next few pictures are of the garage now that they've taken all the supports out from inside the garage.


Looking from the window (east) toward the side door (west).


Standing by the side door looking toward the windows.


Finished the upstairs bedroom.


Windows in everywhere but the music room which still had to be framed. 


Back of the house. With the windows.


Back corner by the master and the garage.


Front with some early roofing material. 



Bedroom above the garage with the awning.


I got into the crawl space to see what the plumbers were up to. 



Here is where we had to add a false wall for plumbing, making our living room about 3.5 inches shorter than we had planned. I think we'll servive.


A few days later they had something going on.


It cleaned up nice.


Water running to the laundry room.


The back porch beams are coming together.



The back with some more roofing stuff over the garage and the porch beams.


Music room all done...Finally.


This was the last picture we took before leaving the property today. 

Tomorrow we have a big meeting at the flooring store to go over our finishes and presumably pick out flooring. We looked at some stains and will be finalizing that. We are picking a stain for the timbers as well as for the tongue and groove ceiling above the porch and the back patio. More info to come.


Popular posts from this blog

Stem Walls and Windows

  They poured the concrete into the forms early last week and took them off within a day. They then came back and cleaned up the job site and let the concrete cure for the rest of the week. I love the view here facing that sunset! While we were waiting for the concrete to cure we met with our builder and the distributor that they use for their windows and exterior doors. They had bid out the windows based on the plans and we were meeting to go over everything and clarify questions. Before the meeting I reviewed the plans and compared it to the bid and found that they had missed one of windows in a guest bathroom and the bid had mentioned that two windows shown on the elevation plans were not on the actual floor plans and so we had to be pretty thorough. They had the windows drawn in as casement windows but in my mind I had always imagined single hung windows. I didn't know what these were called but I visited the  Anderson Windows website  and as I looked around I found o...

Backfilling

  Not a ton to report this week. They are working on backfilling. They have to backfill the garage with compactable soil and will then pour the slab in the garage. They also have to fill the areas where we will have our front porch and back patio with the compactable soil but the rest of the stuff can be backfilled with regular soil. Here are some pictures of the progress.  You can't really tell from this picture above, but there is quite a slope down from the house into the back yard and I'm going to have to figure out how to landscape that... The weather was spring-y and crappy this last week so I thought the blue sky was a nice one to end on. The weather is supposed to change from 50's and rainy to the 70's and sunny come April so we are looking forward to that! This last picture is the most recent one from earlier today. 

Cranes and Trusses

  The crane was scheduled for Tuesday so on Monday they got things ready.  Early Tuesday morning they were cranking. Here's the crane from far away. The crane in action.  View of the back dinning room. Great room with trusses. Great room as seen from the entry way.  The upstairs bedrooms were done with this little perch of what became a hallway. This is the "before" so you can appreciate the after. They put the trusses on the upstairs bedrooms over the entryway and you can see that below.  Trusses over the main living area and some of the trusses over the garage where there is some more living space. The crane was rented for 5 hours on Tuesday and this is what they got done. They will get the crane again this week and they are hoping to be done with the trusses at that point.  They put up the front, east facing, wall of the hallway. Same thing from inside the garage. Back, west facing, wall of the hallway was done. Starting to push out over the garage. This...