Now we're cookin!


Monday


Upstairs music room is where the window is and the closest room is the loft/movie room.


View from the music room above the garage. 





Still waiting on trusses for the room over the left garage. 



I came by on Wednesday and there was a crew of guys I didn't recognize working and apparently with all the difficulty from last week our crew added some guys and they got moving. The soffits and fascia were going up quick. 




They also got started on the porch.



This is our view to the east. As the sun sets in the west the mountains turn pink. The mountain to the left just changed back to it's normal color but the other mountain is beautiful this time of night.


Same view from the garage.


Same view from the music room above the garage.


Porch from the staircase landing. 


Beautiful sunset to the west. View from the dinning room. 


Thursday had us making even more progress on the back side of the house. 


Today they started covering the porch. 



More work on the back of the house. 


The last set of trusses were brought in over the bedroom over the garage. This is the view from the hallway looking into the bedroom. There is a bathroom on the right and the entrance to the loft/music room area is to the left. 


View from the bedroom down the long hallway. 


View from the music room to the loft and other bedroom. 


This little area was a bonus storage area we found in the loft. We'll add a little door and make it a closet. It's about 6"6' tall.


This is where we left it this afternoon.

We met with the builders on Tuesday and did a framing walkthrough. We made sure the walls in the bathrooms were right and had enough room for the pipes. We talked about lowering ceilings in some areas but didn't really do a lot of that. We were told to expect that in about 3-4 weeks we'll be doing an electrical and plumbing walkthrough. Looking forward to it. 

 

Popular posts from this blog

Foundations

 One of the things I really want is a big, open garage. We planned it all out in the drawings but recently we heard back from the structural engineer that they will have to put a post/column in the middle of the garage. We talked with our builder about what could be done. She asked about a bigger truss but the truss guy says that they can't build a bigger truss.  We decided to pay the engineer to do the math and see if a large steel beam could be used because according to our builder she doesn't expect the beam to add that much cost, if its possible.  The engineer is currently working on seeing if its possible. If it is possible they will likely have to make the footings bigger and that would add concrete cost but overall the cost can't be predicted until the engineer updates his plans. Once the plans are updated our builder can let us know about costs and at that point we can decide if the increase cost is worth it or not.  I feel that paying an engineer a little mo...

Cranes and Trusses

  The crane was scheduled for Tuesday so on Monday they got things ready.  Early Tuesday morning they were cranking. Here's the crane from far away. The crane in action.  View of the back dinning room. Great room with trusses. Great room as seen from the entry way.  The upstairs bedrooms were done with this little perch of what became a hallway. This is the "before" so you can appreciate the after. They put the trusses on the upstairs bedrooms over the entryway and you can see that below.  Trusses over the main living area and some of the trusses over the garage where there is some more living space. The crane was rented for 5 hours on Tuesday and this is what they got done. They will get the crane again this week and they are hoping to be done with the trusses at that point.  They put up the front, east facing, wall of the hallway. Same thing from inside the garage. Back, west facing, wall of the hallway was done. Starting to push out over the garage. This...

Ugggghhhhh...

This was a text exchange with our builder from 2 weeks ago...COVID is essentially over but we're still dealing with the effects... A week after the text above this was done. They really only put the joists above the kitchen, dinning room and the formal living room area and finished the plywood walls.  Above is a picture from the entrance hall looking through the main living area (where we will have vaulted ceilings) and into the dinning room/kitchen area.  Kitchen looking into the dinning room.  Stairs will go here. Front of the garage. You can see the stairwell poking up behind the garage. Full frontal... Looking from the dinning area down the hall to the master. Wood burning fireplace will go between those windows.  Looking at the main living area from the kitchen. Looking from the house out into the garage. Same as above just panned right. Exterior garage. In all likelihood nothing will really change until the week of June 14th-18th and from there I bet it'll be a...