More slow and steady progress




They are making slow but steady progress on the roof. They say it's pretty complicated and that it takes a lot of brain power to make it work as they connect the different slopes from the different trusses. 


The bonus closet in the loft/movie room was framed out and the roof has been put up over it.


Plumber came and drilled holes for the plumbing!


Toilet holes in the bathrooms.


View from the front porch.


View of the front porch. 


Front porch on the right, they are still working on the roof over the garage.


Garage.


More garage.


View from the southwest corner of the house/garage.


Back of the house. The roof is done on the back. The back patior/porch should be getting done this week, or at least they should get started. 


Northwest corner of the house.


View of the sunset from the dinning room.


They put some nice pieces of wood around the garage openings.


Close up wood around the garage. 


Dog wash in the laundry room.


Soffit in the mudroom over where the lockers will be. 


They dropped a ledge for the shower area to tie the glass into.


They had to extend the wall on the right where the cabinets will come out so that they aren't sticking out further than the wall. Also built in the wall where the fridge will be.


A closet built into the powder bath. 


They got the tubs built in in two of the 3 upstairs bathrooms. See above and below.



That bonus closet has the doorway built in now.


The wall on the left of the alcove was brought out to be even with the wall on the right. There will be a set of cabinets and someday, hopefully, a mini-fridge. This is in the loft/movie room.

We met with the builder and the plumber and we have to bring out a wall in our great room/living room to make room for some plumbing, which is annoying, but it should only eat into our room by about 4 - 6 inches. That means they may have to move one of the windows so it stays centered in the room. So, unfortunately some work still needs to be done. The beams to go in the living rooms should be put in this week and the windows should be getting installed as well. We'll see if they can keep up with the promises they've made. The framers are good but slow. I'm hoping when we move on to the next subs we can catch up on some of the time we've lost. 

Popular posts from this blog

Foundation Prep

The soil on our lot was not great for a foundation so we had to dig a deep hole and then back fill it with soil that can compact well enough to support the house. We had to put 3 feet of backfill in! We watched them bring load after load of dirt and then smooth it out and compact it and then do it all over again until the full 3 feet were filled in. Last night I took my daughter up there after soccer practice and we walked around on the final grade. Footings and forms should be going up next week!

Cranes and Trusses

  The crane was scheduled for Tuesday so on Monday they got things ready.  Early Tuesday morning they were cranking. Here's the crane from far away. The crane in action.  View of the back dinning room. Great room with trusses. Great room as seen from the entry way.  The upstairs bedrooms were done with this little perch of what became a hallway. This is the "before" so you can appreciate the after. They put the trusses on the upstairs bedrooms over the entryway and you can see that below.  Trusses over the main living area and some of the trusses over the garage where there is some more living space. The crane was rented for 5 hours on Tuesday and this is what they got done. They will get the crane again this week and they are hoping to be done with the trusses at that point.  They put up the front, east facing, wall of the hallway. Same thing from inside the garage. Back, west facing, wall of the hallway was done. Starting to push out over the garage. This...

HOA Approval!

  Well, spring is coming, we have figured out our financing situation and we are moving forward. We plan on starting excavation in the next 2-3 weeks!  We met with our builder to choose some of the exterior colors and such to submit to our HOA for approval before we start the building process. We colored our plans to try and get a feel for what it may look like.  The house will have areas of stucco and board and batten siding with brick accents and stained wood posts on the porch.  Color of the stucco is Sherwin Williams - Alabaster White We had fun trying to pick a color for our brick. General Shale has a ton of options but you have to double check to make sure the brick you like is manufactured at a plant close to where you live or the shipping costs can be REALLY high. I think they also have stone if that's the look you're going for. We are going with the Cambridge 6060 because we like that its red but that it has variation.  We are planning on staining the...