Progress!

 


Well, we have made some progress!


On Monday and Tuesday they had finished the floor and laid the tops and bottoms of all the rooms out. The floor boards were glued and nailed down and they are tongue in groove type of boards, which I thought was cool. 


The next day they had half the bottom floor framed. They still haven't done the garage walls for some reason. 



The next day, Thursday, they had the entire first floor done except where the staircase is.
This view is the south half of the east facing side of the house (looking at the front - the ramp off the the very far right of the picture is the front entrance.)


This is north side of the house. If you look close you can see the ramp into where the front porch will be. 


This is the northwest corner of the house. The two little boxes are the concrete posts where the back patio will be.


Here is the back of the house. 


This is a panoramic picture of the front of the house so it looks a bit "fish-bowly" if that's a word, but you get the idea.


I saved the best for last. This is the view from the master bedroom window. We will have similar views from the kitchen/dinning room windows as well. I tried to get a picture of those views/windows but somehow it got messed up. I'll try to remember to get one next time. 







Popular posts from this blog

Here we go again!

Trusses arrived today! This was the first of two loads! That's a lot of trusses. This week, in preparation for the trusses the crew came out for a few days to get some of the upstairs done that didn't need the truesses. This is looking from the great room into the kitchen and above the kitchen and front room we have some bedrooms.  They started the staircase and I noticed that under the landing there was A TON of wasted space. See above and below.  I asked our builder about in and she said she'd talk with the crew.  The steel beam arrived for the garage. It is very big. The crew finished the stairs and opened it up BIG TIME! I was super happy about this. It increased the storage in our house dramatically. I'm six feet tall and can walk into the farthest back part of this closet standing straight up. IT IS AWESOME!!! More closet. Where the ladders are stored is about 6 feet tall! Landing on the staircase. Down this hall will be another bedroom and a loft and my music roo...

Slow and steady

Small but steady changes. The crane came back this week and put up a few trusses over the garage but overall, not a lot of externally visible changes, but some small things were done. The timbers for the porch are all mostly in place but I'm told that getting a 4:12 roof to line up with an 8:12 roof is pretty tough and that is what is happening over the porch. This is what they should be working on this week. Entry. Straight ahead will be the fireplace between those two windows.  Upstairs, this is one of the last areas that needs to be framed out. The crane will be coming back in this Thursday for the last of the trusses to be hung over the other half of the garage. Though not a lot of visible work was done on the outside of the house this week somethings have been going on inside. If you look at the picture above there is a 2x4 along the ground in the doorway. This is how they framed the whole house.  It seems that this week they've been cutting and removing the 2x4 on the th...

Foundation Prep

The soil on our lot was not great for a foundation so we had to dig a deep hole and then back fill it with soil that can compact well enough to support the house. We had to put 3 feet of backfill in! We watched them bring load after load of dirt and then smooth it out and compact it and then do it all over again until the full 3 feet were filled in. Last night I took my daughter up there after soccer practice and we walked around on the final grade. Footings and forms should be going up next week!